WELLS
(103)
Essentiality of permit
(1) No
new well shall be dug without the permission of
the Secretary.
(2) Where
any person intends to dig a well, he shall submit
an application in the form in Appendix A to the
Secretary, together with a site plan and document
to prove the ownership.
(3) The
site plan shall show the position and dimension
of the well, including expected depth and all
the existing and proposed building and structures
in the site and the neighbouring buildings and
structures within 15 metres radius from that well.
(104)
Set back
(1) The
set back from any street shall be as that required
for a building.
(2) There
shall be 1:50 metres set back from any street
shall be as that required for a building.
(3) The
well may be located within or abutting or away
from the building on the plot.
(105)
Wall and surrounding
The
well shall be protected with brick wall with minimum
1 mt. Height and the surrounding area shall be
paved with non-slippery material to a width of
minimum 90 cm.
(106) Fees
The
application fee and permit fee shall be in Schedule
I and Schedule II respectively.
(107) Approval of plan and issue of permit
The
Secretary shall, if convinced of the boundaries
and plan and bonafides of the ownership approve
the plan with or without modification and issue
permit.
(108) Validity and renewal
(1) The
permit once issued shall, be valid for two years
and may be renewed for a further period of one
year by submitting an application in white paper,
typed or written in ink, affixed with necessary
court fee stamp.
(2) The
application for renewal shall be submitted during
the valid period of the permit and the renewal
fee shall be fifty per cent of the permit fee.
(109) Completion report
The
applicant shall submit a completion report to
the Secretary, in white paper typed or written
in ink, specifying the date of completion.
|