Specifications
 
Kitchen Black granite top for counter and stainless steel sink with single drain board will be provided as standard. Concrete slab on request. Glazed tile above the working platform to height of 40 cms.
Flooring   Vitrified tiles for Drawing and Dining; semi-vitrified tiles for other areas.
Toilet   Ceramic tiles for floor and glazed tiles for walls up to a height of 165 cms and fixtures of premium quality.
Windows   Aluminum windows with glazed shutters
Doors   Apartment main door frame in teakwood with paneled shutter. Wooden frames with paneled shutters or flush doors for other rooms
Electrical Provisions   Wiring with adequate light, fan and plug points, controlled by ELCB and MCBs with independent KSEB meters. Provision for Airconditioner in Master Bedroom. *
Generator   Standby generator with capacity to provide emergency power for lift, common lighting, water pumps and each apartment. Auto switchover optional.
Lift   One passenger lift and one passenger cum service lift.
Painting . Acrylic Emulsion paint with putty finish for interior and enamel paint for wood work. Long-lasting exterior paint
Water Supply   Corporation water supply with sump tank and overhead tank for drinking purpose and ground water for all other purpose.
Fire Arrangement   Firefighting arrangement as per National Building Code and Kerala Fire Force Department requirements.
Car Parking   Car parking on ownership basis. Allotment on FCFS basis.
   
 
  • Other Features :
  • Provision for Cable TV connection in living room. *
  • Telephone point in living room. *
  • Society Office room.
  • Common Servants / Drivers rest room and toilet
  • Recreation and party area.
  • Fitness Centre.
  • Swimming Pool.
  • Children’s play area.
  • Wi-fi networking in selected area. Wi-fi in apartments optional
  • Provision for Cable TV connection in living room. *
  • Telephone point in living room. *

       * Optional for other rooms.

  Project Status
 
Lower basement and Upper basement floor car park structure completed
Ground, First, Second, Third & Fourth and Fifth floor structure completed.Sixth floor structural work in progress.
Ground, First, Second, Third and Fourth floors wall block work in progress.
Sump water tanks work in progress.
 